As part of NASA’s Miss Artemis 3 and Artemis 4 projects, lunar launches are possible in 2025 and 2028. The developer and partner of the host system is Space. He launched the Orion spacecraft.

Just the other day, astronauts Nicole Mann and Doug Wheelock took part in a facelift test demonstration. In the word “ride” they will first of all be dressed in prototype spacesuits. In this case, the platform is divided into functional sections, specific uses and testing interfaces.

The equipment was replaced with unnecessary elements of lifting the entrance ramp and opening/closing the entrance hatch during the transfer process and the platform along a vertical rail system.

According to the plan, on the eve of the manned mission it will be released without equipment, and Miss Artemis 2 will soon be launched in April 2024. My newest equipment on the Orion spacecraft eclipses the moon and the sky back.

Source: Tech Cult

Previous articleThe investigative commission closed the criminal case against blogger Lerchek and her husband
Next articleIt is said that the cameras of the next Samsung cell phones will capture the invisible
I am a professional journalist and content creator with extensive experience writing for news websites. I currently work as an author at Gadget Onus, where I specialize in covering hot news topics. My written pieces have been published on some of the biggest media outlets around the world, including The Guardian and BBC News.

LEAVE A REPLY

Please enter your comment!
Please enter your name here