The object was built about 10 km from the shores of Shanghai, and food from the open sea wind farm located almost entirely nearby.

The 223 million dollar project is implemented by Hailanyun. The first stage was designed for 198 server shelf (792 AI server) and must win in September. With power, the central GPT-3.5 will be able to perform the task of the education level.

According to developers, cooling with sea water reduces energy consumption by at least 30% compared to ground centers.

The idea of ​​underwater server Corps has previously tested Microsoft as part of the Natick project, but has never reached a commercial stage. China plans to distribute technology on an industrial scale by relying on state support.

At the same time, experts warn the possible risks for marine ecosystems and the vulnerability of these objects against attacks. However, Hailanayun claims that the environmental impact is minimum.

Source: Ferra

Previous articleAMD and Intel Road maps in Mobile CPUs until 2027 were leaked to the network on August 25, 2025, 07:01
Next articleOn August 25, 2025, 07:15, KTC introduced 8 GB RAM and 24 Android monitor with only $ 144.
I am a professional journalist and content creator with extensive experience writing for news websites. I currently work as an author at Gadget Onus, where I specialize in covering hot news topics. My written pieces have been published on some of the biggest media outlets around the world, including The Guardian and BBC News.

LEAVE A REPLY

Please enter your comment!
Please enter your name here