Any construction work begins with a foundation. Then, gradually the walls are erected. But in the case of her Exchange in the city of Detroit, the Bashes had to retreat from freedom. It’s all about the location, location and size, which was not accompanied by the usual work of the construction team.
Now, the building with a height of 63 meters is almost completed. Its creators found a very original solution by turning to modular technology. It provides for the direct assembly of the floor on the ground with their subsequent rise to the desired height. At the same time, new floors, as it were, were built from top to bottom. Correct
Liftbuild uses the “lifting plate” series known since the 1950s of the last century, but with a modern izmie. So, it was clear that the firm was fundamental, but the truth is that it was not centralized. Inside them with an inspection of flights of stairs and elevator systems. Builders assemble the floors, performing all the necessary work on laying engineering systems.
It costs the first 500 tons per day. When it is ready, it is raised to the desired height. The process of lifting the first floor (which is located at a distance from the ground) lasted about 10 hours. The floors are then firmly attached to the supports using a patented connection system. This approach to construction will allow you to build a building in which the view from each of its windows is not blocked from the outside by the last
Source: Tech Cult
I am a professional journalist and content creator with extensive experience writing for news websites. I currently work as an author at Gadget Onus, where I specialize in covering hot news topics. My written pieces have been published on some of the biggest media outlets around the world, including The Guardian and BBC News.